Welcome to the project library page of the KGSP website. Here you will find links to download application documents, as well as the latest news about the progress of the proposal. If you have any questions about the documents below, please get in touch.
Material Change Documents
A Material Change (MC) application is being prepared to the Keuper Gas Storage Project Development Consent Order (approved in 2017) to underground hydrogen storage. The MC application process commenced in early 2025 and includes scoping, environmental survey and assessment stages alongside stakeholder engagement and public consultation.
Pre-Application Documents
- KGSP Statement of Engagement – Click here to download
- Scoping Opinion June 2025 – Click here to download
- Scoping Report April 2025 – Click here to download
Previous planning documentation is available in the project archive:
Material Change Consultation Documents
PEIR Chapter 2 Proposed Development Description
PEIR Chapter 4 EIA Methodology and Consultation
PEIR Chapter 5 Planning and Policy Context
PEIR Chapter 6 Geology and Ground Conditions
PEIR Chapter 7 Hydrology and Flood Risk
PEIR Chapter 9 Noise and Vibration
PEIR Chapter 10 Ecology and Nature Conservation
PEIR Chapter 11 Landscape and Visual Impact Assessment
PEIR Chapter 12 Cultural Heritage
PEIR Chapter 13 Socio economic Characteristics
PEIR Chapter 14 Population and Human Health
PEIR Chapter 15 Major Accidents and Disasters
PEIR Chapter 17 Climate Change and GHG Emissions
PEIR Chapter 18 Cumulative Effects Assessment
PEIR Chapter 19 Securing Mitigation
PEIR Figure 1.2 Consented Development Boundary
PEIR Figure 2.1 General Arrangement showing Main Site DCO Order Limits
PEIR Figure 2.3 General Arrangement Showing Main Site Consented Development vs Proposed Development
PEIR Figure 2.5 Hydrogen Flowlines Proposed Below Ground Limits of Deviation
PEIR Figure 2.6 General Arrangement Showing GPP Area Consented Development vs Proposed Development
PEIR Figure 2.7 Main Equipment Areas
PEIR Figure 2.8 Consented Development Vent vs Proposed Development Flaring
PEIR Figure 2.9 Consented Development GPP Area vs Proposed Development GPP Utility Compound Stores
PEIR Figure 2.10 General Arrangement showing Consented Development NTS vs Proposed Development HAGI
PEIR Figure 2.11 General Arrangement GPP Area Site Roads Consented vs Proposed Development
PEIR Figure 2.13 GPP Area Consented Arrangement vs Proposed Arrangement 33kv Powerlines
PEIR Figure 2.14 Indicative Programme of the Main Construction Activities
PEIR Figure 4.1 EIA Methodology
PEIR Figure 6.1 Geology and Soils Study Area
PEIR Figure 6.3 Site Layout Plan Showing Potential Sources of Contamination and Receptors
PEIR Figure 7.1 Hydrology and Flood Risk Study Area
PEIR Figure 7.2 Surface Water Hydrology
PEIR Figure 7.3 Flood Risk Fluvial
PEIR Figure 7.4 Flood Risk Pluvial A01
PEIR Figure 7.5 Flood Risk Reservoir Inundation A01
PEIR Figure 8.2 Nearest Human Receptors
PEIR Figure 8.3 NO2 Hourly Process Contribution
PEIR Figure 8.4 Nox 24 hour Process Contribution
PEIR Figure 9.1 Noise Sensitive Receptors Noise Monitoring Locations
PEIR Figures 11.1 11.2 and Viewpoint Locations
PEIR Figure 12.1 Cultural Heritage Study Area
PEIR Figure 12.2 Designated and Non designated Assets within 250m
PEIR Figure 12.3 Designated Assets within 1km
PEIR Figure 12.4 Historic Areas
PEIR Appendix 6A Phase 1 ESA For Submission Part 1
PEIR Appendix 6A Phase 1 ESA For Submission Part 2
PEIR Appendix 7A Flood Risk Assessment For Submission
PEIR Appendix 9A Baseline Noise Assessment
PEIR Appendix 10B Great Crested Newt Survey
PEIR Appendix 10E River Condition Assessment
PEIR Appendix 11A Visualisations Part 1
PEIR Appendix 11A Visualisations Part 2
PEIR Appendix 12A Historic Environment Desk Based Assessment
Our online Q&A session which took place on Wednesday 22nd October, can now be viewed online below.